2019-07

Research at AirVenture, July 21-26:

  • Sheet metal workshop
  • Garmin seminar on their offerings for experimental aircraft, plus booth visits
  • Dynon booth visits
  • CO Detectors that interface to EFIS
  • LED lights to replace the current landing light

July 28: Began fabrication of an offset line for the fuel strainer drain.

  • Measure cowl openings
  • Design offset tubing
  • Locate and select fittings
  • Practice cutting and flaring 1/4" tubing
  • 2 hours