2019-08

Aug. 7: Removed the engine in order to make it easier to apply additional lay-ups in the tail area. Labeled all connections, and sealed all oil lines and oil fittings.

 

BEFORE:

 

 

 

AFTER:

 

 


 

 

Aug. 8: Sorted hardware

 


 

Aug. 9: Removed nutplates for the custom fairings (decided to go with traditional G-200 fairings instead)

 

 

 

 

 

 

 

Also on Aug. 9: Marked seat pan cut-out area

 

Aug. 11: Bonded the engine data plate to the back of the sump using JB Weld.

Aug. 13: Fabricated an offset for the fuel strainer drain so that it's not centered above the exhaust.